1. Sub-grade preparation: level and compact the underlying soil to design density. Remove sharp objects that could puncture the grid.
2. Roll placement: unroll Geo Grid in the direction of the main traffic flow. Keep the grid flat and taut — wrinkles defeat the reinforcement.
3. Overlaps and connections: minimum 300 mm overlap between adjacent rolls in the direction perpendicular to traffic. For high-strength uniaxial walls, mechanical connections (clips, bodkin joints) are required.
4. Aggregate placement: dump aggregate forward from one end onto the placed grid, never directly on un-aggregate-covered grid. Use light equipment for the first 150 to 200 mm lift to avoid damaging the grid.
5. Compaction: first pass with light roller, subsequent passes with standard compactor. Confirm density meets specification.
6. Quality control: photograph placement, retain mill certificates, log roll IDs against chainage.
Auroguard supplies installation guidance and on-call technical support during the initial roll-out on every Geo Grid project.
Related Products
Products referenced in this guide

Geo Grid
High-stiffness biaxial and uniaxial polymer geogrids engineered for aggregate interlocking, weak subgrade road reinforcement, and steep slope earth retention.
View product
3D GEO MAT
High-performance three-dimensional UV-stabilized polymer erosion control mat engineered for slope stabilization, embankment protection, and root-reinforcement.
View product
BITIMUNOUS GEOMEMBRANE
Elite elastomeric bitumen-modified composite geomembrane engineered for heavy hydraulic barriers, waste containment, and high-puncture mining liner systems.
View product
CEMENT BLANKET
Advanced flexible concrete-impregnated fabric engineered for rapid hydraulic lining, slope erosion control, and ditch armor applications without mixing or batching.
View product
COIR EROSION CONTROL BLANKET
100% biodegradable coir fiber erosion control blanket woven with natural jute organic netting for heavy-duty slope stabilization and sustainable vegetation establishment.
View product
Dimple Board
High-density polyethylene (HDPE) dimpled drainage board engineered for sub-surface water management, foundation waterproofing protection, and structural drainage enhancement.
View productAbout the author
Hitesh Lunnia
Director at Auroguard Private Limited. Auroguard manufactures highway crash barriers, guardrails and geosynthetics to IRC, MoRTH and IS specifications, supplying NHAI, PWD and EPC infrastructure projects across India. This guidance reflects direct manufacturing and project-supply experience — not third-party rewriting.
Need this for a live project?
Talk to the Auroguard desk for specifications, documentation and dispatch.