PP Silt Fence - Stormwater Sediment Control for Road Construction Sites

Upload product image to /images/pp-silt-fence.jpg

Geosynthetics & Civil InfrastructureASTM D6461Sediment BMP

Auroguard PP Silt Fences are temporary sediment control barriers consisting of woven polypropylene geotextile fabric attached to support posts and installed along contours at the perimeter of construction sites and disturbed slopes. As stormwater flows through the fabric, fine sediment is filtered out and deposited on the uphill side, preventing sediment-laden runoff from entering drainage channels, water bodies, and adjacent properties. Specified as a best management practice (BMP) on NHAI, PWD, and state highway construction projects under environmental clearance conditions. Supplied as pre-assembled fence with posts, or as fabric rolls for site assembly. UV-stabilised for 12–24 months service life matching typical construction period.

Technical Specifications

ParameterSpecification
Fabric MaterialWoven polypropylene, UV-stabilised
Apparent Opening Size (AOS/O95)0.15–0.60mm (ASTM D4751)
Permittivity0.05–0.20 s⁻¹ (ASTM D4491)
Grab Tensile Strength≥ 450 N (ASTM D4632)
Fabric Height600mm / 900mm
Post Spacing1.5m – 2.5m (depending on slope)
Post MaterialWooden stake (50×50mm) or steel U-post
StandardASTM D6461, IS 16352, NHAI BMP Guide

Frequently Asked Questions

What is a silt fence used for in road construction?
A silt fence is a temporary sediment control BMP installed at construction sites to intercept sediment-laden stormwater from disturbed slopes. The geotextile fabric allows water to pass while retaining fine sediment, preventing it from entering drainage channels and water bodies.
What fabric is used in PP silt fences?
Woven polypropylene (PP) geotextile with AOS of 0.15–0.60mm is used. The fabric balances filtration effectiveness with adequate flow rate to prevent ponding and overtopping. ASTM D6461 provides the standard test protocol for silt fence fabric selection.
How are silt fences installed on road construction sites?
Posts are driven at 1.5–2.5m intervals along slope contours or at the toe of disturbed areas. The geotextile fabric is attached to the posts and the bottom 150–300mm is buried in a trench and backfilled to prevent undercutting.